
Post-Construction Cleaning
Dust doesn't leave with the contractor. Our HEPA-equipped crews take a finished build from rough to handover-ready — removing the particulate, residue, and detail debris that separates 'built' from 'move-in ready.'
From rough site
to handover-ready.
A six-phase sequence that removes what construction leaves behind — and verifies the space is ready to occupy, not just ready to look at.
- 01
Rough clean — debris & scrapout
Construction debris, packaging, and scrap hauled out and the site cleared for detailed work. It's the unglamorous foundation every later pass depends on — skip it and you're polishing around garbage.
- 02
HEPA dust & particulate removal
Sealed-filter HEPA vacuuming of every horizontal and vertical surface — shelves, ducts, light fixtures, behind and under appliances. The dust you can't see is the dust tenants breathe, so we remove it down to 0.3 microns.
- 03
Adhesive, paint & caulk residue lift
Labels, sticker residue, paint overspray, and caulk lines lifted with solvent-safe chemistry matched to the surface underneath. We protect the finish while we remove the mess — no ghosting, no scoring.
- 04
Glass, fixtures & floor reset
Interior glass polished streak-free, fixtures and hardware shined, and floors cleaned to their finish spec — VCT, LVT, concrete, stone, or carpet. Each surface gets the method it was finished with.
- 05
Final detail & punch-list pass
A white-glove detail pass run against your punch list, with every surface inspected under raking light before sign-off. If light catches it, we fix it — before you do.
- 06
Air-quality verification
An optional particulate and air-quality check so the space is verified ready for occupancy, not just visually clean. Because 'looks clean' and 'is clean' are two different handovers.

HEPA from rough to handover — the particulate contractors leave behind.
Field · 01HEPA-grade capture, finish-safe lift.
The right tools for construction dust — sealed-filter capture, color-coded microfiber, and solvents that lift residue without harming new finishes.
Sealed-filter particulate capture down to 0.3 microns — the standard for clean-room grade removal, not a shop vac with a paper bag.
Color-coded, single-use per zone to prevent carrying dust from one room into the next — the mistake that turns a clean into a smear.
Adhesive and residue lifters formulated safe on stone, metal, glass, and finished wood — matched to the surface, never guessed.
High-reach dusting for vaults, ducts, light fixtures, and exposed structure — the surfaces everyone forgets and every tenant sees.
Scrubbers, polishers, and extractors matched to the floor type and finish — VCT, LVT, concrete, stone, or carpet each get their own method.
Respirators and eye protection where particulate load or chemistry demands it — for our crew's safety and your liability.

Sealed-filter capture, finish-safe lift.
Construction dust settles everywhere — shelves, ducts, behind appliances. Our HEPA vacuums capture particulate down to 0.3 microns while finish-safe solvents lift residue without harming new surfaces.
- HEPA sealed-filter particulate capture
- Color-coded microfiber, single-use per zone
- High-reach dusting for ducts and fixtures
A closer look at the work.

Single-use per zone — dust removed, not relocated.

Finish-safe chemistry staged for the residue lift.

Raking light is the final inspector — before you ever see it.
Glass polished, fixtures shined, floors reset to spec.
Interior glass detailed, fixtures and hardware polished, and floors cleaned to their finish spec — VCT, LVT, concrete, stone, or carpet. The final pass that turns 'built' into 'move-in ready.'
- Interior glass detail
- Fixture & hardware polish
- Floor reset to finish spec

What's included
- Rough debris removal
- HEPA dust extraction
- Paint & caulk residue lift
- Sticker & adhesive removal
- Interior glass detail
- Fixture & hardware polish
- Floor reset to finish spec
- Punch-list detail pass
Ideal for
- New builds
- Tenant build-outs
- Renovations & remodels
- Retail build-outs
- Medical / dental build-outs
- Office fit-outs
Phased to your construction schedule.
“40,000 sq ft of warehouse floor restored and maintained on schedule. Zero slip incidents since they took over the program.”
What a verified handover delivers.
Questions, answered.
When should we schedule the final clean?+
After all trades finish and the punch list is closed. We can phase a rough clean during construction and a final clean at handover — send us the square footage and finish scope and we'll align to your date.
Do you remove adhesive and paint residue?+
Yes. Sticker residue, paint overspray, and caulk lines are lifted with finish-safe solvents that won't harm the surfaces underneath.
Can you handle high-reach dusting?+
We use sealed-filter HEPA vacuums with poles and extensions for vaults, ducts, light fixtures, and exposed structure — the dust you can't see is the dust we remove.
Is air-quality testing included?+
It's an optional add-on. We can run a particulate and air-quality check so the space is verified ready for occupancy, not just visually clean.
Can you phase a rough clean during construction?+
Yes. We can run a rough clean during construction to keep trades moving, then a final clean at handover — and an optional re-clean after furniture or punch-list work settles more dust. Send us the schedule and we'll phase to it.
How fast can you turn a final clean around?+
Most final cleans are scheduled within 3–5 days of notice, with rush options for tight handovers. Send the square footage and finish scope and we'll align to your date.
What builders say about the handover.
“They took our tenant build-out from rough to move-in ready in three days. The HEPA pass removed dust we didn't even know was there — our client walked into a spotless suite.”
“After our clinic renovation, the air-quality check gave our staff confidence to move back in. The detail pass caught residue every other crew missed.”
“We hand over builds every month. MN Facility Pro is the only crew that treats the final clean like a signature — punch-list closed, floors reset, glass perfect.”
Explore the full protocol library
Handing over a build? Let's make it move-in ready.
Send us the square footage and finish scope — we'll phase the clean to your handover date and quote it square-foot–based.
Build my quote



